NNoohiConstruction

Build Ticket · No. VI · 4–10 weeks

Outdoor & Hardscape. Patios, pools-adjacent, pergolas, outdoor kitchens.

Outdoor living builds across Calabasas, Encino, and Tarzana · permitted patio covers, outdoor kitchens, fire features, hardscape, and full backyard transformations.

Outdoor & Hardscape
Plate · OutdoorSFV build · Permitted

The Scope · What's in the contract

Line-itemed. In writing. No surprises.

  1. 01

    Permitted patio covers and pergolas

  2. 02

    Outdoor kitchens · BBQ, sinks, refrigeration

  3. 03

    Hardscape · pavers, concrete, retaining walls

  4. 04

    Gas and electrical for fire pits and lighting

  5. 05

    Drainage, irrigation tie-in, and grading

  6. 06

    Finish carpentry, stone, and tile detail work

The Outcome · What you get

  • 01

    Built for SFV weather and Calabasas wind loads

  • 02

    Engineered drainage · no flooded patios in January

  • 03

    Permitted work · clean record on resale disclosures

The Calendar · Typical timeline

▶ START TO PUNCH LIST

4–10 weeks

Written start and end date in every contract. Miss the end date and we eat the day rate. Weekly Friday update with photos, schedule, and budget.

Get a written quote
Outdoor & Hardscape detail
Plate B · Outdoor

▶ The Standard

Every build runs the same playbook.

  • 01Site visit · written scope · flat-rate quote.
  • 02Plans, engineering, permits · handled in-house.
  • 03Build · city-inspected at every stage.
  • 04Punch list walkthrough · 5-yr P+L warranty.
Call (818) 934-8030

Your free water test

Know exactly what's in your water. Same week.

We bring the test strips, the equipment, and five-years of installs to your kitchen sink. No charge. No obligation. You walk away knowing · even if you don't hire us.

Same-day · 5-year warranty · $0 down