NNoohiConstruction

Build Ticket · No. III · 10–20 weeks

Home Additions. Add the room. Keep the house intact.

Single-story and second-story additions for SFV homes that are out of room but in the right neighborhood. Permitted, engineered, and tied cleanly into the existing structure.

Home Additions
Plate · AdditionsSFV build · Permitted

The Scope · What's in the contract

Line-itemed. In writing. No surprises.

  1. 01

    Plans, engineering, and city permitting

  2. 02

    Foundation work · footings, slab, or stem wall

  3. 03

    Framing and roof tie-in to existing structure

  4. 04

    Full MEP rough-in · mechanical, electrical, plumbing

  5. 05

    Insulation, drywall, and exterior matching

  6. 06

    Final finishes and exterior paint match

The Outcome · What you get

  • 01

    Seamless tie-in · roofline, stucco, and trim match the original

  • 02

    No surprise structural costs · we engineer before we quote

  • 03

    Lived-in within months, not years

The Calendar · Typical timeline

▶ START TO PUNCH LIST

10–20 weeks

Written start and end date in every contract. Miss the end date and we eat the day rate. Weekly Friday update with photos, schedule, and budget.

Get a written quote
Home Additions detail
Plate B · Additions

▶ The Standard

Every build runs the same playbook.

  • 01Site visit · written scope · flat-rate quote.
  • 02Plans, engineering, permits · handled in-house.
  • 03Build · city-inspected at every stage.
  • 04Punch list walkthrough · 5-yr P+L warranty.
Call (818) 934-8030

Your free water test

Know exactly what's in your water. Same week.

We bring the test strips, the equipment, and five-years of installs to your kitchen sink. No charge. No obligation. You walk away knowing · even if you don't hire us.

Same-day · 5-year warranty · $0 down